Chengdu metro line 8 phase I: "dongtong"
On September 19, chengdu metro construction news came, chengdu metro line 8 phase I project all "hole", the line 49 single-line tunnel all through, a total length of about 47.4 km.
The first phase of metro line 8 is a key line connecting the inner and outer center of the city. The project starts from lotus station in the south and reaches shilidian station in the north. The route mainly passes shuangliu district, wuhou district, high-tech zone, jinjiang district and chenghua district. The total length of the line is 29.1km, all of which are underground lines. There are 25 stations in total, including 14 transfer stations and one vehicle depot. After the completion of the line, it will play the role of encrypting the central urban line network, expanding the coverage of rail transit and improving the service level of rail transit.
A person in charge of chengdu metro construction company said that the shield construction of line 8 involved 13 major hazards and 213 major hazards. Faced with difficulties, metro builders braved hardships and dangers to adopt BIM technology for modeling in shield construction for the first time, and reasonably divide operational function areas. It is the first time to use the new material to enhance the safety of the tunnel. It was the first time to realize the color-coded management of the construction pipe network in the tunnel and improve the standard level of shield construction in the subway, which lasted 720 days and nights and finally overcome the difficulties.