Foshan metro line 3 dongle road - daliang section of the right line shield was successfully completed
Recently, the right line of dongle road and daliang section of foshan metro line 3 project was successfully completed, which is also the first subway tunnel to be completed in the core city of shunde district of foshan.
Along the route of this area, it passes through the cultural relic protection area of qinghui garden, and many buildings and structures are under it. The stratum is uneven in distribution of soft and hard, underground pipelines are numerous, the construction environment and geological conditions are complex, the construction organization is difficult, and the safety risk control requirements are high.
To guard against risk further, foshan iron cast group organization cooperated-builing parties to sift interval shield tunnel construction risk source, ahead of time interval pre-reinforcement measures and all kinds of emergency preparedness work, and make the plan of the tunneling parameters in detail, make full use of the interval of the left line of shield first-mover advantage, combined with the construction conditions, the monitoring data, sediment sampling analysis and so on the actual construction situation, dynamic adjustment of shield tunneling parameters, earnestly implement the safety, quality, time limit for a project and other related work, finally to ensure the safety of shield construction, smooth realization through a tunnel.
Between the core area is located in shunde, foshan in after the completion of metro line no. 3, not only increased the foshan subway mileage, more through the city's "main north-south", to further deepen the city guangfo effect, strengthen the foshan district, promote the integration of regional transportation, drive along the rapid development of the region is of great significance.