Singapore Metro Thomson MRT line section T206

    详细说明

    Singapore Thomson Metro Line Contract-T206 Project

    Contract date :4/2014

    Engineering Contractor :Shanghai tunnel engineering co. (Singapore) PTE. Ltd.

    TBM supplier:Herrenknecht

    Slurry separation equipment models:MTP-650*2          

    Filter press models:HAZG500/1600-U*2

    The excavation diameter of TBM:6.6m    

    Tunneling distance:2354m

    Maximum Tunneling speed:4 cm/min

    Slurry flow:650m/h (During Tunneling),Feeding flow:600m/h (Bypass type)

    Feeding density:1.1t/ m

    Slurry density:1.25t/m

    Exhaust pipe into the slurry and slurry pipe diameter:DN250