Singapore Thomson Metro Line Contract T216 LS1
详细说明
Contract date :12/2015
Engineering Contractor : DAEWOO E&C
TBM supplier: Northern Heavy Industries Group Co., Ltd. (NFM)
Slurry separation equipment models:MTP-1100*2
Filter press models:HAZG500/1600-U*2
The excavation diameter of TBM:6.35m
Tunneling distance:2930m
Maximum Tunneling speed:4 cm/min
Slurry flow:1100m3/h (During Tunneling),Feeding flow:1000m3/h (Bypass type)
Feeding density:1.1t/ m3
Slurry density:1.25t/m3
Exhaust pipe into the slurry and slurry pipe diameter:DN300
previous item: Singapore Thomson Metro Line Contract T216 LS10
next item: Shenyang subway station tunnel Olympic Case