Shin Cheongju Cable Tunnel project

    详细说明

     Contract date :09/2021
     Engineering Contractor :DongAh Geological Engineering Co., Ltd.
    TBM supplier:CREG
    Slurry separation equipment models:MTP-650×1          
     Filter press models:HAZG500/1600-U×2
    The excavation diameter of TBM:3.15m