Shin Cheongju Cable Tunnel project
详细说明
Contract date :09/2021
Engineering Contractor :DongAh Geological Engineering Co., Ltd.TBM supplier:CREG
Slurry separation equipment models:MTP-650×1
Filter press models:HAZG500/1600-U×2
The excavation diameter of TBM:3.15m