Gangneung-Anin Thermal Power Plant unit 1&2 Project
详细说明
Contract date :08/2018
Engineering Contractor :DongAh Geological Engineering Co., Ltd.
TBM supplier:Herrenknecht
Slurry separation equipment models:MTP-1400×2
Filter press models:HAZG500/1600-U×3
The excavation diameter of TBM:8.42m
Tunneling distance:2055m
Maximum Tunneling speed:50mm/min
Slurry flow:1400m³/h (During Tunneling)
Feeding flow:1300m³/h (Bypass Type)
Feeding density:0.06t/ m³
Slurry density:0.18t/ m³