Gangneung-Anin Thermal Power Plant unit 1&2 Project

    详细说明

    Contract date 08/2018

    Engineering Contractor DongAh Geological Engineering Co., Ltd.

    TBM supplierHerrenknecht

    Slurry separation equipment modelsMTP-1400×2          

    Filter press modelsHAZG500/1600-U×3

    The excavation diameter of TBM8.42m

    Tunneling distance:2055m     

    Maximum Tunneling speed:50mmmin

    Slurry flow:1400m³/h (During Tunneling)

    Feeding flow:1300m³/h (Bypass Type)

    Feeding density:0.06t/ m³

    Slurry density:0.18t/ m³