Sludge treatment project of Nanxun Tunnel section of Wuxing - Lin 'an Highway
详细说明
Contract date :November 2021
Engineering Contractor : Huzhou Branch of Hongrun Construction Group Co., LTD
Slurry separation equipment models:RS-1850
The excavation diameter of TBM:11.7m
Feeding flow:3600 cubic meters/hour
Engineering Contractor : Huzhou Branch of Hongrun Construction Group Co., LTD
Slurry separation equipment models:RS-1850
The excavation diameter of TBM:11.7m
Tunneling distance: 2440m
Maximum Tunneling speed:40mm/minFeeding flow:3600 cubic meters/hour
previous item: Kunshan Huaqiao silt resource reuse project
next item: Gangneung-Anin Thermal Power Plant unit 1&2 Project