Sludge treatment project of Nanxun Tunnel section of Wuxing - Lin 'an Highway

    详细说明

    Contract date :November 2021
    Engineering Contractor : Huzhou Branch of Hongrun Construction Group Co., LTD
    Slurry separation equipment models:RS-1850
    The excavation diameter of TBM:11.7m
    Tunneling distance: 2440m
    Maximum Tunneling speed:40mm/min
    Feeding flow:3600 cubic meters/hour