logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 16-11 2022

      Shanghai Airport contact line has a new development! The "Ji Yue" shield tunneling machine successfully crossed the subway Line 5

      Shanghai Shentie Investment Co., Ltd. introduced that on the morning of November 11, when the airport link line 3 "Steed" shield machine was promoted to the 1572 ring, the cutter head cut into the projection surface of the rail transit line 5 bridge, and officially began to carry out the crossing work. 
    • 11-11 2022

      "Hongpo" set a new domestic record for the daily diameter of large diameter shield

      Recently, "Hongpu" super-large diameter mud-water balancing shield machine, independently developed and manufactured by CNCC and leased by China Railway Tunnel Bureau, has received one after another good news in Shanghai Metro Metro Airport Link Project 11 mark Skyling Road - Resort station. 
    • 21-10 2022

      Shock! Inside the tunnel of Shanghai Airport connection line, a large shield tunneling machine passes through the subway line 12 quietly...

      Engineers and technicians of China Railway 14th Bureau install sections in the tunnel of the connecting line of Shanghai Airport on Oct 20, 2022. Shanghai Airport Link Line is the first municipal railway in Shanghai, with a total length of 68.6 kilometers, running through several districts in Shanghai, starting from Hongqiao Hub and ending at Shanghai East Railway Station. There are 9 stations along the line, with a designed speed of 160 kilometers per hour. It is the first municipal railway demonstration project connecting with the national railway network in China.
    • 26-09 2022

      The first section of the third phase of Wuhan Metro Line 11 "Jiangsheng" shield tunneling machine officially started

      On September 23, with the slow rotation of the cutter head, the first section of the third phase of Wuhan Metro Line 11 "Jiangsheng" shield tunneling machine officially started, which is the first shield tunneling machine of the line.
    • 14-09 2022

      Zhanjiang Bay undersea tunnel shield tunneling machine successfully crossed the main channel of Guangzhou-Zhanjiang high-speed railway

      At 10 am on September 13, "Yongxing" shield tunneling machine of Zhanjiang Bay undersea tunnel of Guangzhou-Zhanjiang high-speed railway successfully crossed the main channel of Zhanjiang Bay without any impact on the main channel of Zhanjiang Bay during the period, indicating that Zhanjiang Bay undersea tunnel has successfully overcome new technical difficulties and achieved a breakthrough.
    • 09-09 2022

      The Pearl River Estuary tunnel of Shenjiang Railway "Shenjiang No. 1" has been drilled more than 680 meters

      At present, the construction of the Pearl River Estuary TUNNEL project of Shenjiang Railway, which is the largest underwater tunnel with the largest depth and the largest water pressure in China, is progressing smoothly in Humen. The domestic shield tunneling machine "Shenjiang 1" has drilled more than 680 meters under the sea.
    • |<
    • <<
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • 14
    • 15
    • 16
    • 17
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回