logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 10-09 2020

      The left line of "Da-hua" section of Hefei Rail Transit Line 4 has been completed successfully

      On the morning of September 9th, with the "Fenfa No.1" shield tunneling machine, the left line of the shield tunneling section between Daqiang Road Station and Huashan Road station of Hefei Rail Transit Line 4 was successfully completed.
    • 04-09 2020

      Dalian Metro Line 5, Huhu Area shield between the two lines through

      On August 31, the left line of Dalian Metro Line 5 between Hutan New Area station and Hutan Park Station passed smoothly, marking the smooth completion of the two lines between Hutan New Area station and Hutan Park Station.
    • 28-08 2020

      The shield of "Longxing" of Shaoxing Metro Line 1 started off smoothly

      Recently, the shield of "Longxing" of Shaoxing Subway Line 1 has started successfully, which marks that the shield tunneling stage of No.13 of Shaoxing Subway Line 1 has officially entered the stage.
    • 20-08 2020

      Starting tunneling of Aojing Shield section of Line 1 of Shaoxing Rail Transit

      On August 18, the shield on the right line of The Olympic Body center station and Jinghu Station of Shaoxing Rail Transit Line 1 started off smoothly, which is the sixth starting interval of the whole line.
    • 13-08 2020

      The supporting transportation plan for the construction of Pudong Airport Station of Shanghai Airport liaison line has been announced

      According to the Shanghai Municipal Public Security Bureau traffic Police Headquarters, the airport liaison line pudong Airport Station is scheduled to start construction on the evening of August 21, 2020, with a total construction period of about three years.
    • 06-08 2020

      10 shield tunneling machines of Guangzhou Metro Line 18 have been completed

      Recently, the "Guorong" shield tunneling machine responsible for the right line tunnel construction of shaxi to Garagang section of Guangzhou Metro Line 18, and the "Tiebing 17" shield tunneling machine responsible for the left line tunnel construction of No. 3 intermediate air well and No. 4 shield tunnel of Hengli to Panyu Square (hereinafter referred to as "Hengpan Interval") have successfully completed their construction tasks and "tunneling" successfully. Among them, the exit of "Tiebing No.17" marked the completion of two lines between no. 3 intermediate air shaft and No. 4 shield shaft in Hengpan District. It is reported that up to now, line 18 has a total of 10 shield tunneling machines, 34 at the same time underground construction.
    • |<
    • <<
    • 12
    • 13
    • 14
    • 15
    • 16
    • 17
    • 18
    • 19
    • 20
    • 21
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回