logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 08-06 2020

      The latest development of the Shanghai Airport liaison line has been announced

      The Shanghai Airport Link line has 9 stations, which adopt the national railway standard, with the design speed target of 160km/h, and adopts the laying method of viaduct, ground and underground, mainly underground. The project is scheduled to be completed and put into operation in 2024, when the transit time between hongqiao and Pudong is expected to be less than 40 minutes.
    • 22-05 2020

      The longest shield tunnel of line 22 was connected by two lines

      Following the successful exit of the "tiebing no. 1" shield tunneling machine, "tiebing no. 2", the last shield tunneling machine in charge of the construction of metro line 22 from qi-fu to guangzhou south railway station (hereinafter referred to as "qi-guang section"), also completed the construction task successfully on May 18, marking the completion of the double-line tunnel in this area. This is the longest shield range on the whole line and the first to realize the connection between the two tunnels.
    • 14-05 2020

      The maluan bay section of xiamen rail transit line 6 was successfully completed

      At 9:30am on May 13th, xiamen rail transit line 6 (maluan bay section) jimei island station to xibin intersection station, the two lines of cross-sea shield tunnel interval through! The length of this section is about 7600 meters. The tunneling task of the cross-sea tunnel has been completed successfully. Another difficult and high-risk project of xiamen metro has been overcome!
    • 09-05 2020

      Nanjing ningju line four work area east to the left of the sentence interval shield smoothly started

      Recently, the ningju intercity rail transit project ushered in the first major construction node after the resumption of work, east street station ~ jurong station interval left line "eight bureau 40" shield machine smoothly started.
    • 26-04 2020

      Deep foundation pit excavation of jiangbei working well of "the first tunnel of wanjiang river" in south city of anhui province

      Recently, "wanjiang the first tunnel" - jiangbei work tunnel project jiangbei deep pit excavation. This marks the first crossing tunnel on the 800li wanjiang river officially started construction, also means the city's fourth crossing channel officially started. "This tunnel across the river is the most difficult project of its kind at present. The length of shield tunnel (tunneling machine at the same time as the tunneling tunnel to lay supporting pieces) is up to 4 kilometers, including 1.8 kilometers of bedrock, the rock is very strong, which poses a lot of challenges for the construction."
    • 15-04 2020

      Shenguan intercity chimelong station to panyu avenue station left line shield tunnel through

      On April 13, the 3970-meter shield tunnel between changlong station and panyu avenue station was successfully completed. This is the first major node of the project since it fully resumed work after the COVID 19 outbreak, and construction of this section of the tunnel is 97% complete.
    • |<
    • <<
    • 13
    • 14
    • 15
    • 16
    • 17
    • 18
    • 19
    • 20
    • 21
    • 22
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回