logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 15-06 2021

      The west extension of Guangzhou Metro Line 7 to Shunde realized long rail connection four days ahead of schedule

      On June 11th, there were many happy events at the construction site of the west extension of Guangzhou Metro Line 7 in Shunde. At 3 o 'clock in the afternoon, the project realized the "long rail connection", which was another node's victory after the "short rail connection" on May 15. It marked the official realization of the "rail connection" of the whole section of the west extension of Guangzhou Metro Line 7 to Shunde, 4 days ahead of the original plan!
    • 07-06 2021

      The world's first large diameter ultra-small turning TBM "Funing" off the production line

      On the morning of June 4th, the world's first large diameter (9.53m) ultra-small turning TBM "Funing" was successfully rolled off the production line in Tianjin. The minimum turning radius of the device is 90m, and the maximum longitudinal slope is 9.02%, which is the equipment with the smallest turning radius and the largest longitudinal slope in the world of large diameter TBM.
    • 02-06 2021

      Two TBM tunnels in Shanwu section of Qingdao Metro Line 8 were opened

      After receiving the first dual-mode TBM on May 22, Qingdao Metro Line 8 received the good news on May 31 -- the second dual-mode TBM tunnel was successfully received, marking the smooth completion of the dual-mode TBM tunnel in the Shan-5 section (South Shandong Road Station to Wushu Square Station).
    • 28-05 2021

      The first section of Guangzhou Metro Line 22 was completed with short rail

      On May 25, the first section of Guangzhou Metro Line 22 (Panyu Square to Chentougang) was completed with the last 25-meter rail section from Panyu Square to Chentougang station.
    • 25-05 2021

      The first shield tunneling machine in the Zhangzhou extension section of Xiamen Metro Line 6 started smoothly

      On May 20, with the rumbling sound, the shield tunneling machine dressed in "red" slowly moved forward, and the first shield tunneling machine "Longjiang No. 1" started smoothly at Guishan Station of Zhangzhou Taiwan Investment Zone.
    • 20-05 2021

      The China-Russia shield crossing project along the eastern route of the Yangtze River has officially started drilling

      BEIJING, May 18 (Xinhua) -- China's tunneling machine "Unblocked" launched smoothly at 10 am on May 18 at the site of the Yangtze River shield crossing project on the eastern route of Russia, marking the official start of drilling of the project. This project is the shield tunneling project for oil and gas pipeline across the river, which has the longest tunneling distance, the deepest burial depth, the highest water pressure, the largest caliber and the most complicated construction environment in the world.
    • |<
    • <<
    • 17
    • 18
    • 19
    • 20
    • 21
    • 22
    • 23
    • 24
    • 25
    • 26
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回