logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 02-08 2019

      Xiamen metro line 6 maluan bay section of the shield tunnel section successfully completed

      Xiamen metro line 6 (maluan bay section) maluan central station to jimeidao station reached a two-way crossing at 10:30 this morning.
    • 31-07 2019

      Chengdu rail transit line 9 runs through the tunnel

      In the early morning of July 30, 2019, with the roar of the cutter head of "endeavour 4" shield tunneling machine, the shield tunneling machine of chengdu west station -- huangtianba station of chengdu rail transit line 9 broke through the earth at the receiving end, marking the "tunnel access" of the whole line.
    • 26-07 2019

      Harbin metro line 3 shield machine starts

      At 11:00 on July 23, no. 16129 shield tunneling machine started smoothly on the left line of tj-12 sign yi road station - haping road station area of the second phase of Harbin metro line 3 (hereinafter referred to as "zhenha interval").
    • 23-07 2019

      Hefei rail transit line 5 "huanghua" shield section right line through

      On the morning of July 22, the right line of shield tunnel between huanghe road station and huayuan avenue station of hefei rail transit line 5 was successfully completed, becoming the 32nd single-line tunnel of line 5.
    • 18-07 2019

      Kunming metro line 1 northwest yanmaitrei station successfully capped

      Yesterday morning, with the completion of the last concrete roof, the main structure of yanmaitrei station on the northwest of subway line 1, which was built by the sixth company of Shanghai bureau of China railway, was successfully capped.
    • 11-07 2019

      The shield tunnel section of left line from xuzhou road station to liuwei road station of tianjin metro line 4 is connected

      On July 10, as the "number one" of shield machine in six weft road station of tianjin metro line 4 slowly break out, the subway line 4 of the left line of xuzhou station to six weft road station shield interval smoothly, this is the subway line in the first through the tunnel under construction in tianjin, marked the subway line 4 to achieve the goals of all taken a solid step.
    • |<
    • <<
    • 19
    • 20
    • 21
    • 22
    • 23
    • 24
    • 25
    • 26
    • 27
    • 28
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回