-
30-11 2018
Construction Progress of Metro Line 4 Tunnel from Xiaotun Station to Jindingshan Station
Yesterday at 1400 hours, with the cutter head of "Chuncheng 5" shield machine slowly breaking through the earth, the Left-Line tunnel of the shield section between Xiaotun Station of Kunming Rail Transit Line 4 and Jindingshan Station, constructed by Guangzhou Railway Engineering Bureau Urban Rail Engineering Co., Ltd., was successfully connected 15 days ahead of the planned construction period. -
27-11 2018
Shijiazhuang metro construction is steadily advancing! Phase II of Line 1 will be operational in the first half of next year
Recently, the municipal government issued a notice that in order to promote the construction of the second phase of Line 1 as a whole, it has decided to set up a leading group for the second phase of Shijiazhuang Urban Rail Transit Line 1, which will mainly study and solve the major problems in the promotion of the project, as well as the problems related to ensuring the 24-hour construction of the second phase of Line 1 under the early warning weather of air pollution. Ensure the operation of the second phase of Metro Line 1 in the first half of 2019. -
19-11 2018
Two key tunnels in Tongzhou Metro
Reporters learned from Beijing General Residence Group that the section from Yunjing East Road Station to Wansheng Nanjie Xikou Station on No. 7 East Extension 02 and from Shiyuan Station to Global Theme Park Station on No. 01 South Extension of Batong Line have been connected at the same time recently. The two new lines are all suburban auxiliary subway projects, and are open for trial operation at the end of 2019. -
13-11 2018
The first domestic double wheel milling accelerates the construction of Nanchang Metro
On November 11, at the construction site of Anfeng Station of Nanchang Metro Line 4, the first domestic double-wheel milling machine independently developed by China Railway Science and Technology Group has been continuously grooving diaphragm wall for more than one month. Through the actual test, its performance is qualified, and this latest independent innovation achievement is speeding up the construction of Nanchang Metro. -
08-11 2018
Shield construction of Xi'an Metro Line 9 crossing the Ba River
On October 16, good news came from the front line of the construction of Xi'an Metro Line 9. After 72 hours of hard work, the shield tunneling project of No. 3 Left Line of Metro Line 9, constructed by China Railway Tunnel Bureau, successfully crossed the Bahe River. -
06-11 2018
New progress has been made in the construction of Nanjing Metro Line 7.
Reporters learned from Nanjing Metro that at 20:00 on October 19, the left shield section of Luotang Street Station - Gaomiao Road Station on Line 7 was smoothly connected. On the 24 day of October, the portal steel plates were completely closed at night to complete the shield receiving work safely.