logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 09-08 2018

      Bashan high-speed Micangshan tunnel across the line

      At 10:20 on the 9th, with a loud noise coming from the depths of Micang Mountain in Nanjiang County, Bazhong City, Sichuan Province, the Micangshan Tunnel, which lasted five years and a total length of 13.8 kilometers, was officially completed.
    • 06-08 2018

      The first tunnel of the Guangzhou-Shenzhen high-speed rail section runs through

      On August 5th, it was learned from the Jinshen Railway Engineering Headquarters of the China Railway Sixth Bureau that the Shenzhen-Shenzhen High Speed Rail Stem Wei Tunnel was successfully completed. This is the first tunnel through the Guangdong section of the Shenzhen-Shenzhen High Speed Rail. The Houwei Tunnel is located in Dongshui Town, Heping County, Guangdong Province. The tunnel has a total length of 164.63 meters and a maximum burial depth of 29.5 meters. Construction began on April 1, 2018.
    • 01-08 2018

      Jiangtong Expressway Ford Tunnel right through

      On July 31, the second longest tunnel on the Jiangtong Expressway, the Ford Tunnel, was safely completed, marking another major step forward in the overall construction of the Jiangtong Expressway to overcome difficulties.
    • 16-07 2018

      7.2 Kilometres of two seven tunnel construction is imminent

      New progress has been made in the construction of the Erqi Tunnel, which has received much attention from the public. The "Construction Project Site Selection Opinion" of the Erqi Tunnel(Phase I) project is being publicized. The project site is from the west of Lake Avenue to the east of Hongdu North Avenue. The land area is about 562 acres. The Erqi Tunnel is positioned as the main road of the city. The first phase of the project is the Huangjiahu section(Xiangjiang intersection) to the Hongdu Avenue section. The route is to Bihu Avenue-Jinjiang Road-Minjiang Road-Erqi North Road. The total length is about 7.2 kilometers.
    • 10-07 2018

      Kunming Metro Line 4 will be completed on June 30, 2020

      The Northwest extension of Kunming Rail Transit Line 1 and Line 4 have entered a full stage of attack. Metro Line 4 will be completed on June 30, 2020!
    • 29-06 2018

      The construction of Nanjing Metro Line 5 steadily promoted the smooth start of the first shield machine

      This morning, the Nanjing Metro Line 5 ushered in the core node-the first shield "beyond" shield machine on the entire line successfully originated in the Jiyin station-Jiulonghu station section(hereinafter referred to as the Ji-Jiu section) of the TA01 standard section. This marked a phased victory for the entire project and entered a new construction peak.
    • |<
    • <<
    • 22
    • 23
    • 24
    • 25
    • 26
    • 27
    • 28
    • 29
    • 30
    • 31
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回