logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 27-09 2018

      Shijiazhuang Metro Line 1 phase two project speed up

      On both sides of the Hutuo River, with flowers and plants growing and roads stretching, subway builders are working hard to connect the main city and Zhengding New Area with the second phase of Metro Line 1. Recently, Shijiazhuang Metro Line 1 Phase II project administrative center station to Tianyuanhu Station left line to achieve "long-distance rail links", the second phase of line 1 construction will run a better and faster subway speed, will also realize the Shijiazhuang people's desire to travel to add bricks and tiles.
    • 21-09 2018

      Construction of Dalian Metro Line 5 has entered the acceleration period of shield construction.

      On September 18, Dalian Metro Line 5 Houguancun Station to Houyan Station section, "Dalian 2" shield machine officially started, and the same section of the "Dalian 3" shield machine will start on the 30th of this month. The construction of shield tunneling in the same section started twice within half a month, which marked the construction of Dalian Metro Line 5 into the accelerated period of shield construction.
    • 20-09 2018

      Qingdao metro construction has made new progress: Line 1 is about to start renovation.

      Qingdao Construction Management Information Network recently issued a tender announcement, Metro Line 1 project mechanical and electrical installation and decoration supervision project is pre-qualification.

        
    • 17-09 2018

      First: the first mud shield started the construction of sea crossing section 8 line.

      This morning, the slurry shield tunneling started smoothly from Dayang Station of Qingdao Metro Line 8 to the east of Qingdao North Station, which is the first slurry shield tunneling across the sea since the construction of Qingdao Metro.

    • 16-09 2018

      Nanjing Metro announces construction of 6 lines S8 South extension is expected to be completed in 2020

      Dragon and Tiger Network News (Reporter Zhou Caiyun) Today (September 12), Nanjing Metro announced the construction of six subway lines, involving Line 5, Line 6, Line 7, Line 1 North extension, Line 2 West extension, S8 South extension. The specific circumstances are as follows:

    • 15-09 2018

      Changsha‘s 4 newly built subway development progress 4 line is expected to run at the end of the year.

      At present, the construction of Line 3 is advancing in an all-round way. Among the 25 stations on the line, 21 stations have been constructed and 4 stations have been constructed. The section has completed 43.21 km, 11 sections have been connected by two lines and 2 sections have been connected by one line. Station electrical and mechanical systems have been launched.

    • |<
    • <<
    • 26
    • 27
    • 28
    • 29
    • 30
    • 31
    • 32
    • 33
    • 34
    • 35
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回