logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 26-02 2024

      Xiamen Electric Power and Qingshui Island Tunnel project will be excavated from the coast to the end of the island and is expected to be completed and put into use in 2026

      Recently, it was learned that Xiamen's key livelihood project - Xiamen Power and water Island Tunnel project has entered the shield phase of the sea section, the project coastal bottom to the end of the island, is expected to be completed and put into use in October 2026.
    • 16-01 2024

      Hefei Xinqiao Airport Line S1 first shield section double line through

      On the morning of January 12, with the breaking of the "Struggle No. 2" shield tunneling machine, the right line of the Guzhen Road Station - shield tunneling section of the advance section of Hefei Xinqiao Airport Line S1 was successfully broken through, marking the first double penetration of the area in the whole line, and the key progress of the project construction.
    • 19-12 2023

      All 6 shield tunneling machines in Hebei section of Beijing Rail Transit Line 22 have been excavated

      On December 15, the last shield tunneling machine "Endeavour" in the Hebei section of Beijing Rail Transit Line 22 (Pinggu Line) started smoothly at Chaobai Street station, marking that all six shield tunneling machines in the Hebei section entered the digging state.
    • 05-12 2023

      Qingdao Metro's first soil pressure and small mud water dual mode shield machine successfully rolled off the assembly line

      Recently, Qingdao Metro's first soil pressure and small mud water dual-mode shield machine "China Railway 1348" successfully passed the offline acceptance.
    • 27-11 2023

      Wuhan Metro Xingang Line phase I project Wanbai section left line shield starts

      On November 23, in the underground hole at the end of the station with a depth of 18 meters, the cutter head of the shield machine weighing more than 500 tons slowly rotated, marking the opening of the "underground journey" of the left line shield machine in the section from Wanjiazui Station to Baiyushan Station of the first phase of the Wuhan Metro Xingang Line.
    • 17-11 2023

      The longest lakeshore tunnel under construction in China - Zhushan Lake Tunnel has been completed

      On November 14, with the completion of the last piece of roof concrete pouring, the main structure of the tunnel of the 341 provincial highway Yixing Section 3 standard project has been completed, marking the longest domestic trunk highway under construction lakeshore tunnel - Zhushan Lake tunnel through the whole line.
    • |<
    • <<
    • 1
    • 2
    • 3
    • 4
    • 5
    • 6
    • 7
    • 8
    • 9
    • 10
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回