-
28-05 2019
Beijing rail transit new airport line phase I project to achieve the full line of long rail link
Beijing rail transit construction and management co LTD said on May 24 that the first phase of the new airport line has been completed, and it is expected to begin commissioning work on all high-speed trains in mid-june. -
24-05 2019
Shield section of the right line between jingdong avenue station and liangwan station of Nanchang metro line 3 was successfully completed
In the early morning of May 22, 2019, as the cutter plate of the shield tunneling machine slowly drove out of the tunnel, the shield tunneling section of the right line between jingdong avenue station and liangwan station area of nanchang metro line 3 was successfully completed. At this point, line 3 has successfully completed the completion of 17 single tunnel. -
22-05 2019
Mud water treatment equipments which our company provide to the Korea have been delivered successfully
Recently, with the shipment of the last batch of goods, the two sets of mud water treatment equipment for the shield tunneling mud water treatment project of the jiangling nuclear power plant in South Korea, signed by our company and Korea east Asia geological engineering co., ltd. have been successfully completed and delivered to the customer in the shortest time. -
21-05 2019
The left side of shield tunnel section of fengxihe station of the first phase of line 17 of chengdu metro is unblocked
At 12:30 on May 17, the tunnel of the left line between the first phase of line 17, wuho hospital station and fengxihe station area, was successfully completed, becoming the third tunnel of line 17 and the first section of chengdu metro to adopt the shaft free spiral shield tunnel. -
13-05 2019
The roof of the last station of the first phase of xi 'an metro line 6 has been sealed
On the morning of May 10th, the main structure of xi 'an metro line 6 was successfully capped as the last roof was poured at the sixth road station of the first phase of xi 'an metro line 6. -
10-05 2019
Lanzhou rail transit line 2 dingxi road to wulipu left line tunnel through
On May 9, good news came from China railway 21st bureau group. Recently, lanzhou rail transit line 2, the first phase of dingxi road to wulibu left line tunnel implemented by the bureau rail company was successfully completed, marking a crucial step in shield tunneling.