logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 06-05 2016

      Construction of Shanghai Beiheng Road New Construction Project II Standard Section Shields Originating Well Floor Pouring Completed

      On May 6, the pouring of the bottom of the well of the shield originating from the new construction project of the Beiheng section of the Beiheng tunnel under the construction of the tunnel share Shanghai tunnel was completed, creating conditions for the subsequent large-scale diameter shield structure to originate.
    • 15-03 2016

      Korea Daewoo Engineering Construction Co. Ltd.. Come to visit our company

      On March 15, a delegation from Korea Daewoo Engineering Construction Co., Ltd. came to our company for inspection. The delegation was composed of three members: Mr. CHOI, Senior Tunnel Engineer; Mr. JONES, Tunnel Manager; and Mr. KHIN, Deputy Tunnel Manager. During our visit, in addition to visiting our company, the two sides also conducted detailed exchanges and discussions on the technical issues of the joint project of the T216 standard section of the Singapore Metro Line, and confirmed the doubts between the two sides. The exchange took place in a relaxed atmosphere, and the discussion took place in a lively atmosphere.
    • |<
    • <<
    • 61
    • 62
    • 63
    • 64
    • 65
    • 66
    • 67
    • 68
    • 69
    • 70
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 912-915, No.138 Pingxingguan Road, Jing'an District, Shanghai, 20070, P.R.China

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回